• rewelend publicou uma atualização 3 anos, 3 meses atrás

    Cut, measure and mark plywood

    From the plywood, cut a piece 600mm high x 596mm (the width of the panel) for the back wall, three 582mm-wide x 300mm-deep floors, and four 400mm high x 300mm wide pieces for the sides and doors. Along the 596mm width of the plywood, measure up 200mm and mark the centre to cut a triangle for the roof front. Save the offcuts to make the internal walls.

    Cut out roof triangle

    Position the roof front at the top of the back piece as a template to mark out the top of the triangle, then cut with a handsaw. Smooth over all the pieces with 180-grit abrasive paper, removing any breakout from along the cuts, wiping away dust with a cloth.

    Assemble the side and back panels

    To assemble, use set squares with clamps to stand the side pieces up, run adhesive along the back edges, then position the back piece and secure with bullethead nails at 100mm intervals.

    Tips: Tap the nails 20mm in from the ends to avoid splitting the timber, pulling the plywood into position as you go. When working with PVA adhesive, have a clean damp cloth on hand to wipe away excess as you go, to avoid drips and smudges.

    Install base and rooftop floor

    To install the base and rooftop floor, apply adhesive around the back and side edges, positioning them inside and flush with the end of the walls, securing from outside with nails.

    Tip: Trim self-adhesive film to size with a utility knife and cover the floors before installing.

    Affix middle floor

    Install the middle floor by marking 200mm up the inside and outside of the walls. Apply adhesive around the back and side edges, tap into position and secure from the outside with nails.

    Tip: Stick wallpaper onto the back wall before adding the floor.

    Insert internal walls

    Make the internal walls from the plywood offcuts, cutting two 250mm x 193mm pieces, sliding them onto the ground floor and middle floor.

    Tip: If they don't wedge snugly, apply adhesive to the top, back and base, slide into position, clamp and leave to dry.

    Attach doors

    To hang the doors, position them flush with the top floor. Mark 10mm in from the edges to position hinges at the top and base, using a screwdriver to secure with 6mm screws. Use 6mm screws to install a magnetic catch to the under-side of the middle floor, with the supplied magnets positioned on the inside of the doors.

    Drill window and rafter holes

    Clamp the roof front to a stable surface, mark centre and 72.5mm up from the base and use a 92mm hole saw to drill the round window. Position the roof front against the back wall, clamp, mark centre and 22mm down from the point and use a 22mm hole saw to drill both rafter holes. Sand smooth.

    Position the rafter

    Apply adhesive around the rafter holes and along the base of the roof front. Position the dowel in the holes and angle the base of the roof front to sit on the top floor, flush with the front. Clamp, secure with nails up through the rooftop floor, then leave to dry.

    DIY Villa Doll House Series extras

    Ladder: Make a ladder from 12 pieces of 8mm dowel cut to 50mm long. Drill holes either end with a 2mm bit. Thread 3mm macramé cord through one end of each, add an eye hook then thread back through the opposite side. Space the rungs 30mm apart, dab with adhesive, knot the ends and leave to dry. Twist the eye hook into the underside of the top floor.

MENTORA ELIENAI PEREIRA

Especialista em Liderança Executiva

Diretora Executiva Supra Alimentos, Palestrante, Master Trainer empresarial, formada em Teologia, Direito, MBA  em Gestão de Vendas pela FGV, Especialização em Liderança e Negócios  pela Harvard Business School – EUA, Liderança e Coaching pelo College Business da Universidade de Ohio – EUA, MBA em Desenvolvimento Humano, Especialista em inteligência emocional, Hipnoterapeuta e Master em Programação Neurolinguística.

MENTORA KENNYA FERNANDES

Kennya Fernandes, atua ativamente, há 3 décadas de experiência na área da  Educação, na formação e orientação de milhares de alunos, pais e professores, na escola pública do DF.

Idealizadora do Instituto INVESTSER.

Ministrou aulas , analisou e supervisionou dezenas de futuros psicanalistas em cursos de Psicanálise Clínica.

Hoje atua como Psicanalista Clínica , Orientadora Educacional.  Mentora Executiva para terapeutas, Orientadores Educacionais e Pais de adolescentes.

Hipnoterapeuta, palestrante, Reprogramadora Mental.

Realizou diversas palestras na escolas públicas e particulares do DF e entorno.

Master em Hipnose e

Master em  PNL  ambos pelo instituto Inner.

Pedagoga

Psicopedagoga

Especialista em Neurociência Comportamental e Cognitiva com ênfase em PNL

Especialista em Psicanálise e Saúde Mental

Palestrante Educacional

Trainer

MENTOR MARIO RONDON

Mentor e Educador Executivo. Master em PNL. Piloto militar e da aviação civil. Mestre em Educação; especialista em Mindset Ágil e Growth Hacking; Especialista em Gestão de segurança operacional e em Psicologia Positiva e Desenvolvimento do potencial Humano. Professional Scrum Master, Líder Ágil e gerente de projetos. Professor nos cursos de Administração, Gestão de Pessoas e Aviação Civil. Facilitador em treinamentos com foco em Alta performance, liderança, mentalidade ágil, comunicação e gestão do tempo

AO VIVO | 100 % GRATUITO COM CERTIFICADO

Digite seu melhor email

Receba uma notificação quando abrirmos novas vagas.

Fazer login com suas credenciais

Esqueceu sua senha?